Our project experience spans a wide range of sectors, enabling us to adapt and deliver exceptional results in various contexts. Whether it’s constructing state-of-the-art office spaces, restoring historical landmarks, or undertaking complex infrastructure projects, our team has the expertise and knowledge to meet the unique requirements of each undertaking.

Our Commitment to Successful Project Outcomes at Total Regen

At Total Regen, we take pride in our extensive portfolio of completed projects for a diverse spectrum of public, semi-public, and private organizations. Our experience spans a wide range of genres, from modern working environments to heritage restorations, showcasing our adaptability and commitment to quality.

Navigating Challenges with Strategic Site Management

One of our key strengths lies in effectively tackling projects situated in tight sites with challenging logistical constraints. We understand the significance of minimizing disruptions to the surrounding community, ensuring that our site activities do not negatively impact anyone. This commitment is facilitated through meticulous planning, allowing us to address foreseeable challenges proactively.

Delivering on Diverse Client Needs

Throughout our work, we have successfully completed projects for various public organizations, including government agencies and educational institutions, ensuring compliance with their specific requirements and regulations. We also collaborate with semi-public entities, such as healthcare facilities and cultural organizations, to enhance user experiences.

Furthermore, our partnerships with private organizations encompass commercial developments, residential complexes, and industrial facilities, highlighting our versatility and dedication to quality, functionality, and aesthetics in every project.

Groundworks case studies.

Pebble Mill Care Home Groundworks

The new sports centre has an internal GIFA 6091m2. The site is 3.29 hectares and was occupied by an existing leisure facility which was built in 1973 and remained operational

Premium Meet And Greet Civils

Works involved the construction of a new build transaction building and vehicle damage recording system (VDRS) building together with associated road and car park reconfiguration works.

Sheringham Leisure Center Groundwork

The new facility will replace the existing Splash leisure centre, which will remain open whilst the new centre is built on a different part of the site. The leisure centre will be approximately 3000m² 

Sleeprz hotel Newcastle Groundworks

This project involved the construction of a six storey pre-cast concrete framed hotel on the former site of Network Rail‘s Parcel Sorting Office.

Lauder Lodge Care Home Civils

Farnborough Aerospace Centre is a multi-tenanted business park that was developed in the 1990’s, consisting of several commercial office buildings in a mature landscaped park-like setting

Lidle supermarket Earthworks & Groundworks

The development included the demolition of the former Dyfed Powys Police Station Carmarthen HQ and removal of all asbestos material from the building prior to demolition.

Portland Student Accommodation Groundworks & Deep Drainage

The building faces East, overlooking the City Stadium. The building is being constructed on a brownfield site, and built using a structural steel frame on piled foundations, with a mixture of red and

Park Plaza Bridgend Groundworks

Total was contracted to build 63,000 ft² of retail outlet on Parc Plaza, a popular commercial development on the outskirts of Bridgend. The units were delivered ahead 

Alton Sports Center Groundworks

The new sports centre has an internal GIFA 6091m2. The site is 3.29 hectares and was occupied by an existing leisure facility which was built in 1973 and remained operational

Chester Care Home Civils

The proposed care home for elderly people will provide 58 beds laid out in flexible wings, specially designed to deliver the highest standards in living and communal spaces for

Coalvile Leisure Center Groundworks

The site is home to a 110-station gym, two pools, sauna, steam room & spa, three fitness studios, clip and climb, three squash courts, an eight course sports hall, an adventure trail and café. Total Group

Cramlington Hospital Earthworks & Civils

Total Group has been appointed as principal contractor on the Northumbria Healthcare NHS Foundation Trust’s new Cramlington Hospital training centre.

Ready to start your project?

Let's Work Together

To get started, for general enquiries simply complete the form below. Provide us with your project details, and our team will review your requirements. We will then get back to you with a customised solution that fits your needs. Whether you have a small-scale project or a large-scale development, we have the expertise and resources to handle it. Once we have received  your submission, you will receive a confirmation email (Please check all your email boxes)

If you prefer, and have a project in mind and seeking a price you can also send us your project documents and any photographs directly to Price@totalregen.co.uk. We will carefully examine your documents and provide you with a competitive quote together with a timescale from inception through to completion for your project.

One Partner, Endless Solutions

error: Content is protected !!
Scroll to Top