Sheringham leisure Centre

Sheringham leisure Centre, Groundworks and drainage overview

Total Regen worked in partnership with North Norfolk District Council to construct the new multi-million pound leisure centre in Sheringham, which is being part funded by Sport England.

The new facility will replace the existing Splash leisure centre, which will remain open whilst the new centre is built on a different part of the site.

The leisure centre will be approximately 3000m² GIA comprising of the following:

  • 25m main swimming pool
  • Learner pool with moveable floor
  • Splash pad and associated interactive equipment
  • Village change area; including WC’s, showers and accessible facilities
  • Café including kitchen facilities
  • Community rooms
  • Fitness suite, multi-purpose studios and spin studios
  • Associated external works and drainage
SHERINGHAM-LEISURE-CENTRE-CONSTRUCTION.jpg

Pebble Mill Care Home Groundworks

The new sports centre has an internal GIFA 6091m2. The site is 3.29 hectares and was occupied by an existing leisure facility which was built in 1973 and remained operational

Premium Meet And Greet Civils

Works involved the construction of a new build transaction building and vehicle damage recording system (VDRS) building together with associated road and car park reconfiguration works.

Sheringham Leisure Center Groundwork

The new facility will replace the existing Splash leisure centre, which will remain open whilst the new centre is built on a different part of the site. The leisure centre will be approximately 3000m² 

Sleeprz hotel Newcastle Groundworks

This project involved the construction of a six storey pre-cast concrete framed hotel on the former site of Network Rail‘s Parcel Sorting Office.

Lauder Lodge Care Home Civils

Farnborough Aerospace Centre is a multi-tenanted business park that was developed in the 1990’s, consisting of several commercial office buildings in a mature landscaped park-like setting

Lidle supermarket Earthworks & Groundworks

The development included the demolition of the former Dyfed Powys Police Station Carmarthen HQ and removal of all asbestos material from the building prior to demolition.

Portland Student Accommodation Groundworks & Deep Drainage

The building faces East, overlooking the City Stadium. The building is being constructed on a brownfield site, and built using a structural steel frame on piled foundations, with a mixture of red and

Park Plaza Bridgend Groundworks

Total was contracted to build 63,000 ft² of retail outlet on Parc Plaza, a popular commercial development on the outskirts of Bridgend. The units were delivered ahead 

Alton Sports Center Groundworks

The new sports centre has an internal GIFA 6091m2. The site is 3.29 hectares and was occupied by an existing leisure facility which was built in 1973 and remained operational

Chester Care Home Civils

The proposed care home for elderly people will provide 58 beds laid out in flexible wings, specially designed to deliver the highest standards in living and communal spaces for

Coalvile Leisure Center Groundworks

The site is home to a 110-station gym, two pools, sauna, steam room & spa, three fitness studios, clip and climb, three squash courts, an eight course sports hall, an adventure trail and café. Total Group

Cramlington Hospital Earthworks & Civils

Total Group has been appointed as principal contractor on the Northumbria Healthcare NHS Foundation Trust’s new Cramlington Hospital training centre.

Ready to start your project ?

Let's Work Together

To get started, for general enquiries simply complete the form below. Provide us with your project details, and our team will review your requirements. We will then get back to you with a customised solution that fits your needs. Whether you have a small-scale project or a large-scale development, we have the expertise and resources to handle it. Once we have received  your submission, you will receive a confirmation email (Please check all your email boxes)

If you prefer, and have a project in mind and seeking a price you can also send us your project documents and any photographs directly to Price@totalregen.co.uk. We will carefully examine your documents and provide you with a competitive quote together with a timescale from inception through to completion for your project.

One Partner, Endless Solutions

Follow Us

© All rights reserved you must not copy any content on this website without the written consent of the Total Holdings Group

Part of the Total Holdings Group

error: Content is protected !!
Scroll to Top