Lauder lodge care home

Total Regen was proud to have been awarded the contract for land remediation, groundworks, demolition, and drainage. With our expertise and attention to detail, we successfully completed the project in November 2017, exceeding all the necessary requirements and regulation

Lauder Lodge Care Home: A Community-Focused Development

Total Regen is proud to have been awarded the contract for the design and construction of Lauder Lodge, a state-of-the-art, 60-bedroom care home located on a repurposed brownfield site.

The project’s successful completion in November 2017 stands as a testament to our expertise in land remediation, groundworks, demolition, and drainage. The innovative facility promises a welcoming environment that meets the diverse needs of its residents.

Thoughtful Design and Amenities

Lauder Lodge features a range of carefully designed amenities intended to enhance the quality of life for its residents. These include a café, hairdressers, cinema, library, activity spaces, and a family room, creating a vibrant community atmosphere.

Noteworthy design considerations were made to support residents living with dementia. The sensory gardens, accessible to all ground-floor tenants, offer a serene and calming retreat, while the dedicated play area for children visitors promotes intergenerational connections.

A Focus on Comfort and Accessibility

The layout of Lauder Lodge was strategically planned to minimize confusion, ensuring an easy navigation for residents. Each floor is equipped with its own dining room and quiet spaces, enhancing the living experience.

Furthermore, access to terraces and balconies provides stunning views of Arthur’s Seat and the nearby beach, allowing residents to embrace the outdoors comfortably. The construction, utilizing durable materials such as insulated blockwork and precast concrete, exemplifies Total Regen’s commitment to longevity and quality.

LAUDER-LODGE-CARE-HOME-2.png

Pebble Mill Care Home Groundworks

The new sports centre has an internal GIFA 6091m2. The site is 3.29 hectares and was occupied by an existing leisure facility which was built in 1973 and remained operational

Premium Meet And Greet Civils

Works involved the construction of a new build transaction building and vehicle damage recording system (VDRS) building together with associated road and car park reconfiguration works.

Sheringham Leisure Center Groundwork

The new facility will replace the existing Splash leisure centre, which will remain open whilst the new centre is built on a different part of the site. The leisure centre will be approximately 3000m² 

Sleeprz hotel Newcastle Groundworks

This project involved the construction of a six storey pre-cast concrete framed hotel on the former site of Network Rail‘s Parcel Sorting Office.

Lauder Lodge Care Home Civils

Farnborough Aerospace Centre is a multi-tenanted business park that was developed in the 1990’s, consisting of several commercial office buildings in a mature landscaped park-like setting

Lidle supermarket Earthworks & Groundworks

The development included the demolition of the former Dyfed Powys Police Station Carmarthen HQ and removal of all asbestos material from the building prior to demolition.

Portland Student Accommodation Groundworks & Deep Drainage

The building faces East, overlooking the City Stadium. The building is being constructed on a brownfield site, and built using a structural steel frame on piled foundations, with a mixture of red and

Park Plaza Bridgend Groundworks

Total was contracted to build 63,000 ft² of retail outlet on Parc Plaza, a popular commercial development on the outskirts of Bridgend. The units were delivered ahead 

Alton Sports Center Groundworks

The new sports centre has an internal GIFA 6091m2. The site is 3.29 hectares and was occupied by an existing leisure facility which was built in 1973 and remained operational

Chester Care Home Civils

The proposed care home for elderly people will provide 58 beds laid out in flexible wings, specially designed to deliver the highest standards in living and communal spaces for

Coalvile Leisure Center Groundworks

The site is home to a 110-station gym, two pools, sauna, steam room & spa, three fitness studios, clip and climb, three squash courts, an eight course sports hall, an adventure trail and café. Total Group

Cramlington Hospital Earthworks & Civils

Total Group has been appointed as principal contractor on the Northumbria Healthcare NHS Foundation Trust’s new Cramlington Hospital training centre.

Ready to start your project?

Let's Work Together

To get started, for general enquiries simply complete the form below. Provide us with your project details, and our team will review your requirements. We will then get back to you with a customised solution that fits your needs. Whether you have a small-scale project or a large-scale development, we have the expertise and resources to handle it. Once we have received  your submission, you will receive a confirmation email (Please check all your email boxes)

If you prefer, and have a project in mind and seeking a price you can also send us your project documents and any photographs directly to Price@totalregen.co.uk. We will carefully examine your documents and provide you with a competitive quote together with a timescale from inception through to completion for your project.

One Partner, Endless Solutions

error: Content is protected !!
Scroll to Top